Laserfiche WebLink
ter:. <br />TITAN <br />ELECTr210AL <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Ian Toms <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Grinder Installation (Base Total) <br />THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />6/8/2026 <br />Change # <br />34 <br />Amount: <br />$80,462.50 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Grinder Installation and Shed Wiring <br />■ F&I raceways, conductors, and connections for grinder control cabinet and equipment <br />■ Exterior raceways to be run above grade in GRC from shed to equipment per Owner direction <br />■ F&I branch circuit for shed light, (1) 120V 20A convenience receptacle, and (1) 120V 20A <br />receptacle for existing AC unit <br />■ F&I Ground rods and electrode for shed structure <br />Mill Motor Wiring **NOT INCLUDED IN TOTAL BELOW, PLEASE SEE ADDITIONAL SHEETS FOR OPTION A <br />AND OPTION B PRICING** <br />■ Option A. Provide Belden 29534 VFD cable per Vermeer Installation wiring recommendation <br />■ Option B. Provide XHHW CU wire alternative <br />Clarifications <br />■ Steel frame required for cabinet mounting to be fabricated and installed by others. Dimensions <br />to be determined prior to installation <br />■ Setting and securing cabinet by others. Coordination with Titan will be required for feeder wire <br />routing <br />■ Deviations from this scope and means/methods, commissioning of equipment, and alterations <br />requested byAHJ are not included <br />Cost Breakdown This Change: <br />Labor <br />$42,996.20 <br />Material <br />$24,055.88 <br />Other <br />O&P <br />$13,410.42 <br />Total <br />$80,462.50 <br />Page 1 of 2 <br />