My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-08-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-08-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:10:17 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QBELSAAS P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />SMITH brandon@belsmith.com <br />BELSASC0330H <br />June 9,2026 <br />Re: Grinder Shed and Grinder electrical <br />Per the description below, we present the following change order proposal #74 (COP#74). <br />COP #74 includes all the labor and materials needed to install: <br />• Branch circuit for the shed light, convenience receptacle, and AC receptacle <br />• Ground rods and electrodes for the shed <br />• Exterior raceways to be run above grade from shed to the grinder <br />• Raceways, conductors, and connections for grinder control and equipment. <br />Option A: Vermeer recommended VFD Cable <br />Option B: Vermeer allowable substitute XHHW CU Wire <br />Due to the lack of readily available information and the issues encountered after the equipment <br />arrived onsite, Belsaas is requesting a time extension of 116 calendar days. <br />The grinder shed and surrounding area were not shown or identified on the contract drawings. <br />Once the equipment arrived onsite, numerous discrepancies were discovered between the <br />conditions shown on Vermeer's drawings and the actual field conditions. These discrepancies <br />included: <br />• The electrical panel that arrived onsite differed from the panel shown on Vermeer's <br />drawings. <br />The control panel was not UL listed as anticipated. <br />Due to these discrepancies, additional coordination and communication with <br />Washington State Labor & Industries (L&I) was required to verify that the grinder shed <br />installation and configuration would be acceptable and compliant. <br />The unforeseen site conditions, design discrepancies, and resulting regulatory coordination <br />efforts impacted the project schedule and were outside of Belsaas's control. Therefore, Belsaas <br />respectfully requests a time extension of 116 calendar days to account for these delays. <br />Total cost added to contract <br />Time extension required: 116 days <br />Base + Option A: $164,407.86 + WSST <br />Base + Option B: $157,353.46 + WSST <br />
The URL can be used to link to this page
Your browser does not support the video tag.