My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOR -PAC <br />S E A T I N G <br />P.O. Box 1039 Enumclaw; VJA 98022 ;253)-852-0801 Fax: '253)-852.082 <br />CHANGE ORDER <br />ELLENSBURG RODEO <br />Project Name <br />901 E SEVENTH AVE ELLENSBURG, WA <br />Project Address <br />PATTI STACEY / KITTITAS COUNTY <br />Project Manager Name / Firm Name <br />DESCRIPTION OF CHANGES: <br />(check here ❑ and attach additional pages if more space is needed.) <br />ADD FOR MODIFYING THE POSTS AT CHUTES/G4 <br />8 <br />Change Order Number <br />5/20/26 <br />Change Order Date <br />Detailing/engineering and materials ...... $3,780.00 <br />Engineering <br />Detailing <br />Steel procurement and labor to laser cut the plates <br />The concrete anchors to surface mount the posts <br />1hr of admin time to create and process documentation <br />UPS standard freight to WA <br />Plates would be cold galvanized versus send to a galvanizing facility to be hot dipped. <br />Labor &welding ............ $ 11, 680.00 <br />Notes: includes cutting and patching existing anchors/holes. <br />Total change order .... $ 15,460.00 <br />PRICE. These changes (select one): <br />® raise ❑ lower the price of the contract to $ <br />❑ do not affect the price of the contract. <br />PROJECT DURATION. These changes (select one): TBD <br />❑ extend ❑ shorten the duration of the project by <br />❑ do not affect the duration of the project <br />
The URL can be used to link to this page
Your browser does not support the video tag.