My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=1 rr <br />'TITAN <br />E L E C T R I C A L <br />11 <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Block Heater & Louver <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract# <br />Date: <br />4/9/2026 <br />Change # <br />31 <br />Amount: <br />$4,894.68 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Combine lighting circuits 4 and 21 with lighting circuit 2 to free up panel space in PP-MRW to allow for <br />the block heater and louver circuits to be installed. The cost also includes furnishing and installing <br />approximately 90' of 3/a" conduit from PP-MRW to a location near the louver in the Mechanical RM and <br />an additional 20'to continue on to a location near the block heater. Contactor box with HOA to facilitate <br />exhaust fan and louver with Fire Pump control panel auxiliary contacts. <br />Cost Breakdown This Change: <br />Labor <br />$2,735.85 <br />Material <br />$1,343.05 <br />Other <br />O&P <br />$815.78 <br />Total <br />$4,894.68 <br />Authorized By: Titan Electrical LLC Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Adam Rieker <br />Project Manager <br />4/9/2026 <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.