Laserfiche WebLink
=1 rr <br />'TITAN <br />E L E C T R I C A L <br />11 <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Block Heater & Louver <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract# <br />Date: <br />4/9/2026 <br />Change # <br />31 <br />Amount: <br />$4,894.68 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Combine lighting circuits 4 and 21 with lighting circuit 2 to free up panel space in PP-MRW to allow for <br />the block heater and louver circuits to be installed. The cost also includes furnishing and installing <br />approximately 90' of 3/a" conduit from PP-MRW to a location near the louver in the Mechanical RM and <br />an additional 20'to continue on to a location near the block heater. Contactor box with HOA to facilitate <br />exhaust fan and louver with Fire Pump control panel auxiliary contacts. <br />Cost Breakdown This Change: <br />Labor <br />$2,735.85 <br />Material <br />$1,343.05 <br />Other <br />O&P <br />$815.78 <br />Total <br />$4,894.68 <br />Authorized By: Titan Electrical LLC Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Adam Rieker <br />Project Manager <br />4/9/2026 <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Page 1 of 1 <br />