My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=1 r-.. <br />TITAN <br />ELE:CTR10AL. <br />I <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Gas Detector T&M <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />4/27/2026 <br />Change # <br />32 <br />Amount: <br />$5,314.84 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Install gas detector sensor (provided by others) and terminate to VFD located in MRW Building. Cost <br />also includes furnishing and installing associated parts to ensure function of sensorNFD on a T&M <br />basis. 1 00'of EMT conduit was installed in the non -classified location and 30' of rigid conduit was <br />installed in the classified area, along with fittings for each conduit type. #14 THHN CU conductors and <br />18/4 Belden cable were installed for the control of the gas detector. <br />Cost Breakdown This Change: <br />Labor <br />$4,025.00 <br />Material <br />$404.04 <br />Other <br />O&P <br />$885.80 <br />Total <br />$5,314.84 <br />Authorized By <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Titan Electrical LLC <br />SUBCONTRACTOR <br />Adam Rieker <br />Project Manager <br />4/27/2026 <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.