=1 r-.. <br />TITAN <br />ELE:CTR10AL. <br />I <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Gas Detector T&M <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />4/27/2026 <br />Change # <br />32 <br />Amount: <br />$5,314.84 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Install gas detector sensor (provided by others) and terminate to VFD located in MRW Building. Cost <br />also includes furnishing and installing associated parts to ensure function of sensorNFD on a T&M <br />basis. 1 00'of EMT conduit was installed in the non -classified location and 30' of rigid conduit was <br />installed in the classified area, along with fittings for each conduit type. #14 THHN CU conductors and <br />18/4 Belden cable were installed for the control of the gas detector. <br />Cost Breakdown This Change: <br />Labor <br />$4,025.00 <br />Material <br />$404.04 <br />Other <br />O&P <br />$885.80 <br />Total <br />$5,314.84 <br />Authorized By <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Titan Electrical LLC <br />SUBCONTRACTOR <br />Adam Rieker <br />Project Manager <br />4/27/2026 <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Page 1 of 1 <br />