My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=1 rr <br />TITAN <br />E L E C T R I C A L. <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I ASP Area <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />3/16/2026 <br />Change # <br />29 <br />Amount: <br />$22,246.05 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />• Cost is to provide raceways and conductors for the ASP area, according to the revised E200 <br />sheet released on 3/3/26. <br />• The provided evidence shows items from addendum 2 of sheet E200 as credits and items from <br />the revised sheet E200 as charges. The cost provided is the difference between the two amounts. <br />• There were no additional costs for P-200, P-201, S-203, and S202-1 B. <br />• P-202 includes (3) #4 XHHW-2 AL and (1) #6 XHHW-2 AL conductors to feed the transformer for <br />the irrigation control panel. <br />• P-202 is called out as (2) 3" PVC conduits on the revised version however (1) 2" PVC conduit was <br />already installed as per previous versions of sheet E200. (1) 2" PVC conduit is of sufficient size to <br />provide conductors to the irrigation pump panel. <br />• Cost also includes a 45 KVA 480 V — 208/120V transformer for the irrigation control panel. <br />• Cost includes (3) #1 XHHW-2 AL and (1) #6 XHHW-2 AL conductors from transformer to irrigation <br />control panel. <br />• Cost does not include conductors for P-202A, P-202B, P-202C, S-203, P-204A, or P-204B, as no <br />conductors were called out. <br />Cost Breakdown This Change: <br />Labor <br />$13,300.90 <br />Material <br />$5,237.47 <br />O&P <br />$3,707.68 <br />Total <br />$22,246.05 <br />Authorized By: Titan Electrical LLC Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR _ <br />Adam Rieker <br />Project Manager <br />3/16/2026 <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Page 1 of 2 <br />SUBCONTRACTOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.