My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAA <br />SMITH <br />BELSASC0330H <br />February 17, 2026 <br />Re: LVTS Grinder Piers <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #67 (COP#67). <br />COP #67 includes all labor and equipment required to install the necessary grinder piers. <br />Per Patti's request, this proposal also includes all labor and materials required to form, pour, <br />and strip four (4) piers measuring 24 inches in diameter by 18 inches in height. <br />This pricing assumes that the final engineered design is consistent with standard grinder pier <br />details and does not include extraordinary reinforcement, embedments, specialty materials, or <br />atypical installation requirements. Any deviations from typical design criteria may require <br />review and adjustment to this proposal. <br />Please refer to the attached pages for a detailed breakdown of the associated costs. <br />Total cost added to contract <br />Time extension required: 0 days <br />Sincerely, <br />Riley Eres, <br />Belsaas & Smith Construction <br />$4,869.08 + WSST <br />
The URL can be used to link to this page
Your browser does not support the video tag.