Laserfiche WebLink
1r <br />TITAN <br />E L E C T R I C A L <br />TO: Riley Eres <br />Contractor Belsaas & Smith Construction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I VFD Location Change <br />DESCRIPTION OF ALTERATION: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />2/4/2026 <br />Change # <br />26 <br />Amount: <br />$2,273.39 <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Per RFI 056, the location of the VFD has changed to the Mechanical Room. The cost includes mounting <br />the VFD previously provided by others as well as additional conduit and labor to drop down to the VFD in <br />the Mechanical Room. The cost also includes providing and installing VFD cable from the Mechanical <br />Room to the EF-2 fan as providing VFD cable was not in the original scope. <br />Cost Breakdown This Change: <br />Labor <br />$1,162.65 <br />Material <br />$731.84 <br />Other <br />O&P <br />$378.90 <br />Total <br />$2,273.39 <br />Authorized By: <br />Titan Electrical LLC <br />SUBCONTRACTOR <br />Signature:��. <br />Print Name: <br />Adam Rieker <br />Title: <br />Project Manager <br />Date: <br />2/4/2026 <br />Accepted By: <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />SUBCONTRACTOR <br />Page 1 of 1 <br />