My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=1 rr <br />TITAN <br />E L E C T R I C A L <br />TO: Riley Eres <br />Contractor Belsaas & Smith Contruction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Scales Receptacle for Sign <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />1 /12/2026 <br />Change # <br />24 <br />Amount: <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Provide (2) 20-amp circuits for the sign receptacles. 3/4" EMT conduit has been stubbed up at the <br />Location already as the original prints called for empty conduits to be available at the post locations. <br />However, the original prints did not call for a circuit or receptacle at these locations, so the cost <br />includes ten additional feet of 3/4" EMT per receptacle plus fittings to bring the conduit up the signpost to <br />the required height. The cost also includes 110' of #12 XHHW CU conductors, (2) bell boxes, (2) GFCI <br />receptacles, (2) in use covers, (2) 20-amp breakers, 10.72 hours of labor, and OH&P. <br />Cost Breakdown This Change: <br />Labor <br />$1,232.80 <br />Material <br />$263.33 <br />Other <br />O&P <br />$299.22 <br />Total <br />$1,795.35 <br />Authorized By: Titan Electrical LLC Accepted By: <br />SUBCONTRACTOR <br />Signature: <br />Print Name: Adam Rieker <br />Title: Project Manager <br />Date: 1 /12/2026 <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Page 1 of 1 <br />SUBCONTRACTOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.