Laserfiche WebLink
=1 rr <br />TITAN <br />E L E C T R I C A L <br />TO: Riley Eres <br />Contractor Belsaas & Smith Contruction <br />FROM: Adam Rieker <br />Subcontractor Titan Electrical LLC <br />CHANGE TITLE I Scales Receptacle for Sign <br />COST IS TO: <br />Project: Lower Valley Transfer Station <br />2603 Green Ave <br />Ellensburg, WA 98926 <br />Subcontract # <br />Date: <br />1 /12/2026 <br />Change # <br />24 <br />Amount: <br />Initiated By: <br />Titan Electrical <br />Reason: <br />Design Change <br />Type: <br />Additive - Lump Sum <br />Provide (2) 20-amp circuits for the sign receptacles. 3/4" EMT conduit has been stubbed up at the <br />Location already as the original prints called for empty conduits to be available at the post locations. <br />However, the original prints did not call for a circuit or receptacle at these locations, so the cost <br />includes ten additional feet of 3/4" EMT per receptacle plus fittings to bring the conduit up the signpost to <br />the required height. The cost also includes 110' of #12 XHHW CU conductors, (2) bell boxes, (2) GFCI <br />receptacles, (2) in use covers, (2) 20-amp breakers, 10.72 hours of labor, and OH&P. <br />Cost Breakdown This Change: <br />Labor <br />$1,232.80 <br />Material <br />$263.33 <br />Other <br />O&P <br />$299.22 <br />Total <br />$1,795.35 <br />Authorized By: Titan Electrical LLC Accepted By: <br />SUBCONTRACTOR <br />Signature: <br />Print Name: Adam Rieker <br />Title: Project Manager <br />Date: 1 /12/2026 <br />Signature: <br />Print Name: <br />Title: <br />Date: <br />Page 1 of 1 <br />SUBCONTRACTOR <br />