My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
2026-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:13:18 PM
Creation date
8/27/2026 12:04:40 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
148367
Type
Minutes
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAA <br />SMITH <br />BELSASC0330H <br />May 15, 2025 <br />Re: MRW added and moved plinths #29 <br />P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 FAX: 509-962-3031 <br />brandon@belsmith.com <br />Per the description below, we present the following change order proposal #29 (COP#29). <br />This COP includes all the materials and labor needed to install the additional plinths and <br />baseplates required for the MRW. Per the original bid documents, the MRW showed a quantity <br />of 12 plinth and base plates. Per the approved NUCOR building design, there is an additional <br />eleven plinths that needed to be installed. <br />Total Cost Added to Contract <br />Time extension required: 10 days <br />Sincerely, <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />$14,172.53+ WSST <br />
The URL can be used to link to this page
Your browser does not support the video tag.