COUNTY will therefore process the Construction Permit, or any other <br />necessary authorization, in a timely fashion, and shall not unreasonably <br />withhold or delay its approval of any Construction Permit or other <br />authorization. <br />B. Coordination - All capital construction projects performed by Vantage <br />Wind Energy LLC within ihe Franchise Route shall be inspected by either <br />an inspectii emptoyed by the COUNTY or an independent contractor <br />inspeulul seleuLurj [y Vai'rtage Wirrcl Errergy LLC and.approved by the <br />. <br />COUNTV, such appioval nolto be unreasonably withheld. All work and <br />inspection shall be'coordinated with the Engineering- Division of the Public <br />works Department to ensure consistency with couNTY infrastructure, <br />future CO(JNTY Capital lmprovement Projects, all developer <br />improvements, and pertinent codes and franchises' <br />G. Construction standards - Any construction, installation, maintenance, <br />repair, and restoration activities performed by or for Vantage Wind Energy <br />LLC within the Franchise Route shall be conducted and located so as to <br />produce the least amount of interference with the free passage of <br />pedestrian and vehicular traffic. All construction, installation, maintenance, <br />iraffic control, repair and restoration activities shall be conducted such that <br />they conform'to the most current COUNTY standards in effect at the time <br />that such activities take place. The COUNTY shall provide Vantage Wind <br />Energy LLC with a copy of such standards upon the.issuance of the <br />Construction permit troh tne Department of Public Works referred to in <br />Paragraph A above. <br />D. Underground lnstallation Required - All telecommunications cables <br />and juncti6n boxes or other vaulted system components shall be installed <br />underground unless otherWise exempted from this requirement, in writing, <br />by the-Director of Public Works for the COUNTY. All trench construction <br />snatl comply with the Washington State Department of Transportation <br />standard'specifications for Road, Bridge and Municipal construction to <br />the extent they are adopted by and in effect in Kittitas County at the time <br />of submittal by Vantage wind Energy LLC of trenching plans' <br />E, Removal or Abandonment - Upon the removal from service of any <br />transmission lines or other associated structures, facilities and amenities, <br />Vantage Wind Energy LLC shall comply with all aqplicable standards and <br />requir6ments prescrlbed by the County of Kittitas Public Works <br />Depaftment for the removal or abandonment of said structures and <br />transmission facilities. <br />F. Performance Bond - Prior to any construction within the COUNTY <br />rights-of-way pursuant hereto, Vantbge Wind Energy LLC shall provide a <br />p6rforr"nc6 nonO to the COUNTY in an amount equalto the estimated <br />Vantage Wind EnergY LLC <br />Franchise Agteement <br />5