The City of Ellensburg has been a critical collaborator from the outset. Most recently, the City's <br />leadership partnered with the County by enabling our Community Development Department to take the <br />lead on permitting, an effort that has been essential in navigating a compressed construction timeline <br />and keeping the project on track for completion ahead of the 2025 Ellensburg Rodeo. <br />A contribution from the City's Lodging Tax would build on this strong foundation of partnership. With <br />$t9,5 million already secured, the County is working to close the remaining funding gap and maintain <br />momentum through the final phases of construction. Continued support from the City would <br />demonstrate a shared commitment to delivering a modern, accessible, and high-quality facility that <br />benefits residents, visitors, and the broader tourism economy. <br />9. Risk Assessment <br />While the project is carefully planned, there are potential risks and challenges that could impact its <br />timeline and success. The primary risk is completing construction in time for the next Ellensburg Rodeo <br />and Kittitas County Fair. <br />Rlsk: Construction Delavs: The project is expected to take 9-10 months based on consultations with <br />architects and engineers experienced in stadium construction. However, unforeseen challenges such as <br />supply chain issues, labor shortages, or weather conditions could extend the timeline. <br />Mitiaotlon Strateov: To minimize delays, we will work with experienced contractors who have a proven <br />track record of meeting tight deadlines. We will also implement a phased construction approach to <br />ensure that critical components, such as seating and infrastructure, are prioritized. <br />Risk Limited Pre-Rodeo Event Time: We aim to fully open at least one month before the rodeo, but any <br />setbacks could reduce that timeline. <br />Mitigotion Strategy: By maintaining a buffer period in our schedule, we can still accommodate smaller <br />events and preparation plans even if minor delays occur. Additionally, we will ensure early procurement <br />of materials and permits to prevent administrative delays. <br />Risk: Budget Overruns: Cost overruns could occur due to fluctuating material prices or unexpected <br />scheduling or structural requirements. <br />Mitigation Strategy: A contingency fund is built into the budget to cover unexpected expenses. Regular <br />financiai iracking and cost assessments will help ensui'e expenditures stay within budget. County <br />leadership will explore additional partnerships, if cost overruns are at risk of exceeding the contingency <br />10, Project Feasibility <br />The feasibility of the Ellensburg Rodeo Grandstands project is strongly supported by a foundation of <br />thorough planning, professional expertise, and secured funding, all of which contribute to a high level of <br />confidence in the project's successful and timely completion. This approach ensures that the <br />grandstands redevelopment can move forward efficiently, with minimal risk of delays or budgetary <br />shortfa lls. <br />Comprehensive studies and planning efforts have played a critical role in laying the groundwork for <br />success. Architectural and engineering assessments have confirmed that the proposed construction <br />timeline of 9 to 10 months is both realistic and achievable. The design team has integrated efficient