Laserfiche WebLink
SELLAND P.O. Box I l9 Wenatchec, WA 98807 <br />Phone: (509)662-7119 Fax: (509)662-4465 <br />Bid Date: lanuary22,2026 <br />GiA;teontrctw <br />Ellensburp Rodeo Arena lmprovements - RFP 04 coP <br />Qualifi cations: Please Read Carefullv <br />1. Washington State Sales Tax has been not been included in proposal <br />2. Prevailing Wage has been accounted for in proposal. <br />3. Rock excavation (i.e. Solid Rock, Caliche, Hard pan, cemented soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be <br />required if these materials are encounter€d. <br />4. Over Excavation of Unsuitable Material has not been accounted for, price negotiation will be required if these materials are encountered. <br />5. Excludes Water System Support. <br />6. Exludes Construction Suruey. <br />7. Engineering & Professional Surveying Services are Excluded' <br />8. Fees for Utilities, County, City, Etc. are not included. Cultural Resource Services are not covered in our scope. <br />9. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded <br />LO. Watering & Dust Control are lncluded for Selland's scope of work and duration only. No OT Dust Control or beyond our work. <br />11. Erosion Control lnspections, Reporting, MonitorinB & Maintenance are Excluded. Stormwater Permit by othets. <br />12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included. <br />13. Any scope ofwork not specifically included as a line item in this proposal is excluded <br />14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. <br />15. Due to global supply chain disruptions and market volatility we reserue the exclusive right to adiust our proposal for material escalation. <br />16. Proposal is valid for 30 days. This proposal shall be made part of any subcontract. <br />lf you have any questions or need additional information with regard to our proposal please give us a call. <br />Sincerely, <br />SELLAND CONSTRUCIION, INC. <br />fr*7*F <br />Ron Zerr lll <br />(s09) 961-782s <br />-Productlon Adjustment for 8" C90O to 8" Dl Plpe (Bid @ S61.35/LF, Now @ S88'08) <br />-Production Adjustment for 4" C9OO to 4" Dl Pipe (Bid @ S59.31/tF Now @ 586.04, <br />225 rF <br />2L4 l-F <br />1ts <br />3EA <br />s <br />5 <br />$-Material Cost Difference: C900 Water to Ductile lron <br />-Furnish & lnstall Catch Basins <br />19,000.00 <br />26.75 <br />26.7t <br />Page 1 of 1