Laserfiche WebLink
7 <br />d, The Subrecipient agrees that to receive any federal preparedness funding, all EHP <br />compliance r'equirements outlined in applicable guidance must be met. The EHP review <br />process must be completed and FEMA approval received by the Subreciplent before <br />any work is started fbr which reimbursement will be later requested. Expenditures for <br />projects started before completion of the EHP review process and receipt of approval by <br />the Subrecipient will not be reimbursed. <br />PROCUREMENT <br />The Subrecipient shall comply with all procurement requirements of 2 CFR Part 200.317 through <br />ZOO.}27 and as specified in the General Terms and Conditions (Attachment B, A,10). <br />For alt contracts expected to exceed the simplified acquisition threshold, per 2 CFR 200. 1 , <br />the Subrecipieni must notify the Deparfment The Department may request pre- <br />procuremeni documents, such as request for proposals, <br />. invitations for bids and <br />independent cost estimates, This requirement must be passed on to any subrecipient to <br />whictr the Subrecipient makes a subaward, at which point the Subrecipient will be <br />responsible for requesting and reviewing pre-procurement documents. <br />For alt sole source contracts expected to exceed the micro-purchase threshold per 2 CFR <br />200.1, the Subrecipient must submit justification to the Department for review and <br />approval. This requirement must be passed on to any subrecipient to which the <br />Su'brecipient makes a subaward, at which point the Subrecipient will be responsible for <br />reviewing and approving sole source justifications to any subrecipient to which <br />Subrecipient makes any award. <br />The Subrecipient as well as its contractors and subcontractors must comply with the Build <br />America, Buy America Act (BABAA), which was enacted as a pad of the lnfrlstructure <br />lnvestment ind Jobs Act $$ 70901-70297, Pub, L, No. 117-58 (2021); and Executive <br />Order 14005, Ensuring the Future is Made in All of America by All of America's Workers' <br />BABAA requires any infrastructure project receiving federalfunding must ensure: <br />i. Alliron and steel used in the project are produced in the United States. This means <br />all manufacturing processes, from initial melting stage through the application of <br />coatings, occurred in the United States' <br />ii. All manufactured products must be produced in the United States. For a <br />manufactured product to be considered produced in the United States, the cost of <br />the components of the manufactured pr:oduct that are mined, produced, or <br />manufaciured in the United States must be greater than 55% of the total cost of all <br />minimum amount of domestic content of manufactured product, unless subject to <br />another standard. <br />iii, All construction materials are manufactured in the United States. This means that <br />all manufacturing processes for construction material occurred in the United States' <br />Additionally, applicable infrastructure projects are subject to domestic preference <br />requirements. A domestic preference does not apply to non-infrastructure spending under <br />an award that also includes a covered project. A domestic preference applies to an entire <br />infrastructuro project, even if it is funded by both federal and non-federalfunds under one <br />or more awards. <br />i. Domestic preferences under BABAA only apply to articles, materials, and supplies <br />that are consumed in, incorporated into, or affixed to an infrastructure project, As <br />such, it does not apply to tools, equipment, and supplies, such as temporary <br />scaffolding, broughi to tfre construction site and removed at or before the <br />completion of the infrastructure project. Nor does a domestic preference apply to <br />equipment and furnishings, such as movable chairs, desks, and portable computer <br />equipment, that are used at or within the finished infrastructure project but are not <br />an integral part of or permanently affixed to the structure. <br />ii. lnfrastructure, for the purposes of BABAA, includes, at a minimum, the structures' <br />facilities, and equipment for, in the United States, roads, highways and bridges; <br />Page I of 50 Kittitas county,E26'241 <br />a <br />b <br />c. <br />I <br />I <br />! <br />I <br />! <br />!'1 <br />I <br />I <br />I <br />DFIS.FEMA.EMPG-FY25