Laserfiche WebLink
Agreement PD 2026 <br />whatever means are deemed expedient by the County. Such review may occur with or without <br />notice, and may include, but is not limited to, on -site inspection by County agents or employees, <br />inspection of all records or other materials which the County deems pertinent to the Agreement and <br />its performance, and any and all communications with or evaluation by service recipients under this <br />Agreement. The Contractor shall preserve and maintain all financial records and records relating <br />to the performance of work under this Agreement for 6 years after contract termination, and shall <br />make them available for such review, within Kittitas County, State of Washington, upon request. <br />12. Modifications: <br />12.1 Either party may request changes in the Agreement. Any and all agreed <br />modifications shall be in writing, signed by each of the parties. <br />12.2 The County may, at any time, by written notice thereof to Contractor ("Change <br />Notice") makes changes in the Work within the general scope of this Agreement, <br />including, but not limited to: (a) changes in, revisions to, substitutions for, additions <br />to or deletions of any Work; (b) changes in schedule; and (c) acceleration, <br />deceleration or suspension of performance of any Work. <br />12.3 If any change in the Work causes an increase or decrease on Contractor's cost of, <br />or the time required for, performance of the Work, an equitable adjustment in the <br />compensation to Contractor and in the schedule for the performance of the Work <br />shall be made to reflect such an increase or decrease. <br />12.4 Notwithstanding any dispute or delay in arriving at a mutually acceptable equitable <br />adjustment, Contractor shall proceed in accordance with all Change Notices. <br />Contractor must, within thirty (30) days after receipt of any Change Notice that does <br />not set forth any acceptable adjustment, submit to the County a written statement <br />setting forth any adjustment claimed. <br />12.5 If any change results in a decrease in the Work performed, Contractor shall be <br />entitled to compensation associated with changing the Work, such as revising design <br />already completed, revising calculations already performed, and revising documents. <br />13. Termination for Default: <br />If the Contractor defaults by failing to perform any of the obligations of the Agreement or becomes <br />insolvent or is declared bankrupt or commits any act of bankruptcy or insolvency or makes an <br />assignment for the benefit of creditors, the County may, by depositing written notice to the <br />Contractor in the U.S. mail, postage prepaid, terminate the Agreement, and at the County's option, <br />obtain performance of the work elsewhere. If the Agreement is terminated for default, the <br />Contractor shall not be entitled to receive any further payments under the Agreement until all work <br />called for has been fully performed. Any extra cost or damage to the County resulting from such <br />default(s) shall be deducted from any money due or coming due to the Contractor. The Contractor <br />shall bear any extra expenses incurred by the County in completing the work, and all damage <br />sustained, or which may be sustained by the County by reason of such default. <br />Professional Services Agreement <br />Page 5 <br />