My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
StaffReport_SiphonEasements
>
Meetings
>
2026
>
08. August
>
2026-08-04 10:00 AM - Commissioners' Agenda
>
StaffReport_SiphonEasements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2026 12:07:37 PM
Creation date
7/30/2026 12:05:15 PM
Metadata
Fields
Template:
Meeting
Date
8/4/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution Authoring the Public Works Director Signature on Right of Way and Temporary Easement Documents for Flood Mitigation on Whiskey Creek, RE Parcel Numbers 962710 and 962712
Order
7
Placement
Consent Agenda
Row ID
147059
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Whiskey Creek Siphon Project <br />Temporary Construction Easement Legal Description <br />EXHIBIT "A" <br />Auditor's Parcel No's. <br />962710,962712 <br />PARENT PARCEL: <br />APN: 962710, 962712 <br />Parcels 1A and 1C of that certain Survey recorded March 4, 2022 in Book 44 of <br />Surveys at Pages 150 — 151, under Auditor's File No. 202203040020, records of <br />Kittitas County, Washington; being a portion of Lot 1 of PEARSON SHORT PLAT, <br />Kittitas County Short Plat No. 81-04, as recorded in Book B of Short Plats, Pages <br />42 and 43, under Auditor's File No. 457201, records of Kittitas County, State of <br />Washington; all being a portion of the Southeast Quarter of Section 27, Township <br />18 North, Range 18 East., in the County of Kittitas, State of Washington.; <br />TEMPORARY CONSTRUCTION EASEMENT ACQUISITION <br />A variable width easement over and across the lands described above for stream channel <br />access, improvement, construction and maintenance in the West half of the Southeast <br />Quarter of Section 27, T18N., R18E., W.M. centered about a line described as follows: <br />Beginning at the Westernmost corner of Lot 1A of that certain Survey recorded <br />March 4, 2022 in Book 44 of Surveys at Pages 150 — 151, under Auditor's File <br />No. 202203040020, records of Kittitas County, Washington; thence S89053'26"E <br />along the South line of said parcel, a distance of 269.96 to a corner common to <br />Parcel 1A and 1 B of said survey; <br />thence S59000'21 "W, a distance of 195.95 feet to a point 24 feet Northeasterly as <br />measured perpendicularly from the South boundary of said Lot 1A, said point also <br />being the creek centerline position per Kittitas County Conservation District <br />Siphon Project, prepared by Anderson Perry & Associates, in 2022, said point <br />also being the true point of beginning; <br />Thence N42021'57"E, along the centerline of 60 foot wide easement, a distance <br />of 112.41 feet; <br />Thence N42021'57"E, along the centerline of 200 foot wide easement, a distance <br />of 135.42 feet to the South line of the right of way for the Town Ditch Irrigation <br />Canal, and terminus of said strip. <br />EXCEPT that portion of Lot 1A to be transferred to Kittitas County described as <br />follows: <br />Beginning at the Easternmost corner of said Lot 1A, thence S40°20'03"E along <br />the Southeast line of said parcel, a distance of 202.74 feet; <br />thence N01 002'34"W, a distance of 178.73 feet to a point on the Northeast line of <br />
The URL can be used to link to this page
Your browser does not support the video tag.