My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Document
>
Meetings
>
2024
>
10. October
>
2024-10-15 10:00 AM - Commissioners' Agenda
>
Finalized Document
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2026 3:43:47 PM
Creation date
7/27/2026 3:43:43 PM
Metadata
Fields
Template:
Meeting
Date
10/15/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve an Addendum to the Professional Services Agreement with Clean Earth to Reflect Pricing Increases
Order
6
Placement
Consent Agenda
Row ID
123178
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope lD: 62167 AE6-75D7-4485-8DA7-A28DFDAOF95B <br />September 10,2024 <br />Doug Laurent <br />Kittitas County <br />925 lndustrialWay <br />Eliensburg, WA 98926 <br />CleanEarth <br />QUOTE, ADDENDUM <br />ti: <br />RECHfwffim <br />JUL 2 V 2fr26 <br />-"--XTi'$3,S,3,HHX**** <br />Thank you for allowing Clean Earth Environrnental Solutions, Inc. by and through any of tts subsidia!'ies'or <br />affiliates ("Clean Earth") to service your waste management needs. This addendum is to add or cha'nge <br />addjtional services or pricing to your existrng agree,ment with Clean Earth either at your request, or due to <br />items or servlces ,perfo4.,med tihat are not in your existing pricing schedule wilh us. Please see t'he below <br />pricing scheduie that wil{ be added to your existing agreernent as refer,enced be'low <br />Pricing belowreflects tl-re addition or changes for specrfic nrateria{ to be added to the Master Servtces <br />Agreement (MSA). Changes are reflected'by a,n asterisk. <br />Pricing Details: <br />3PTRCOSTPL <br />ADMLAB <br />Third Party Transporlation, Cost Plus u $l. l5 $ l.ls <br />Unknown Analysis E $ 530.67 $ 530.67 <br />AFOI Altenrate l'uel. <l " Sludge, (<3olo halogens), BTU > 5000 DMO5 $4't,64 s 4v.64 <br />AFOI Altcnratc fuel, no slr.rdge (<3olo)DM55 $ ll9.l0 $ r 35.00* <br />AFO2 Alternate fuel, 0-25% sludge, (<3% halogens), BTl,l > 5000 DM55 $156 71 $ 156.7r <br />AFO3 Alternate fuel, 25-50% sludge. (< 3% halogens), BTLI > 8000 DM55 $156."11 $ r 56.71 <br />Al:04 Alternate fuel, >5 07o slud ge, (<3o/o ha lo gens ), Il TU > I 0,000 DM55 $t 56.71 s 156.71 <br />AFOS Alternale fuel, <3" sludge, <3olo halogens, nou-regulated, BTIJ > <br />5000 DMO5 $47.64 $ 47.64 <br />AFO6 Looscpack pains anrl fuels BX $487.44 $ 407.44 <br />AFO6 Loosepack paints and fuels DM55 $13 7,90 $ 13?.90 <br />AFOS <br />Aerosols, cans ofpaints, solvents, for depressurization and fuel <br />blendins. RCRA <br />BX $ 720.86 $ 720.86 <br />AF08 Aerosols, cans ofpaints, solvents, lor depressurization and fuel <br />blendina. RCIRA DMO5 $59.56 $ 59.56 <br />CleanEarth CONFIDCNTIAL Page 1 of4
The URL can be used to link to this page
Your browser does not support the video tag.