My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO 14 Fully Executed
>
Meetings
>
2026
>
07. July
>
2026-07-07 10:00 AM - Commissioners' Agenda
>
CO 14 Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2026 12:45:24 PM
Creation date
7/9/2026 12:45:16 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Chair Signature on Jail Project Change Order #14 and #15
Order
2
Placement
Consent Agenda
Row ID
146084
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope lD: 89144F8G-M3F-808F-836D-7E5D94EFF238 <br />p.o. Box926 | 700 EAST MOUNTAIN VIEW AVE, SUIrE 504 <br />ELLENSBURG, WA 98926 <br />O: 509-925-9747 C" 619-278'8554 <br />scottc@belsmith.com <br />srLaAtcots0ll <br />June 18,2026 <br />Re: Additional Services <br />Per your request, we are pleased to offer the following change order propo sal #24 (COP 24). <br />lf approved, Belsaas and Smith's onsite team will make the requested upgrades to the first and <br />second floor of the jail facility. This will include: <br />o lnstalling new fencing around the laundry machinery in E011 <br />o Constructing a matron room in E213B, which will consist of a secure wall (plywood and <br />steelskinned), repositioned light, a new hollow metaldoor and frame, and removaland <br />replacement of the drop ceiling <br />r Cleaning and sealing the floor tile grout in the lMod (E107) restroom <br />e Cutting and grinding the supports for the tables and seating and patching the flooring <br />smooth in lMod (E107) <br />o lnstalling the selected carpet squares throughout the entire room in lMod (E107) <br />o Demo'ing existing flooring and rubber base on the areas called out on sheet 49-18 and <br />prepping the concrete below for new floor finish <br />o Polishing prepped concrete floors <br />Total cost of proposal: One Hundred Forty-Four Thousand Seven Hundred Seventy-Nine Dollars <br />$L44,779.77 + wssr <br />Time Extension Required: 84 Days from door submittal approval <br />Sincerely, <br />Scott Carlson <br />Belsaas & Smith Construction
The URL can be used to link to this page
Your browser does not support the video tag.