Laserfiche WebLink
Docusign Envelope lD: ABAB8714-EAE8-8064-8123-710D8'l F2CD3C <br />BELSAAS & SMITH CONSTRUCTION <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />TIME EXTENTION REQUIRED:98 DaYs <br />NOTICE TO PROCEED REQUIRED BY: <br />SHEET 2 of 2 c.o.P. #25 <br />WE RESERVE OUR RIGHTS UNDER THE CONTMCT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />$ 1.172.99 <br />$ 1.172.99 <br />$ <br />$ 9.9 <br />$ 105.06 <br />$ 17.33 <br />$ 1.172.99 <br />$ 1.020.00 <br />$ <br />s 8.746.17 <br />$ 9.919.17 <br />LABOR <br />cosT <br />30.60$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />MATERIAL <br />cosr <br />s <br />$ 7.605.40E 22A.16 <br />E 8.746.17 <br />TOTAL <br />s 783.36s 129.25s 8.746.17 <br />SUB TOTAL <br />SUB <br />COST <br />$ <br />$ <br />EQUIP <br />COST <br />$ <br />$ <br />$ <br />$ <br />TOTALS FROM PREVIOUS PAGE <br />PREVIOUS CO ALLOWANCE <br />SUB TOTAL <br />MATERIAL <br />VERHEAD 3% <br />iOUIPMENT <br />GMND TOTAL <br />BONDING 1.5olo <br />SUB TOTAL <br />LABOR <br />SUBCONTRACTORS <br />SUB TOTAL <br />PROFIT 10o/o