Laserfiche WebLink
County of Kittitas,WA <br /> § 15A.03.100 KITTITAS COUNTY CODE § 15A.03.120 <br /> probable adverse environmental impacts,if applicable. <br /> 6. Consistency between the proposed project and applicable regulations or plan should be <br /> determined through a project review process that integrates land use and environmental <br /> impact analysis, so that governmental and public review of the proposed project, involving <br /> development regulations under Chapter 36.70A RCW, and environmental process under <br /> Chapter43.2 I C RCW run concurrently and not separately. <br /> 7. During project review, Kittitas County or any subsequent reviewing body shall not <br /> reexamine alternatives to or hear appeals on the items identified in such Kittitas County <br /> comprehensive plan and development regulation standards, except for issues of code <br /> interpretation. <br /> 8. When holding a hearing on a project permit application,the hearing body should utilize the <br /> following issues outlined as a review guide: earth,air,water(including irrigation water and <br /> its conveyances),plants, animals, energy and natural resources, environmental health, land <br /> and shoreline use, housing, aesthetics, light and glare, recreation, historic and cultural <br /> preservation,transportation,public services, and utilities. <br /> (Ord. 9810, 1998; Ord. 2000-07; Ord. 2025-003, 3/18/2025) <br /> § 15A.03.110. Posting site. <br /> 1. These provisions shall apply to all development applications, except for development <br /> applications processed administratively. <br /> 2. The applicant shall post the subject property with signs as required by Community <br /> Development Services. <br /> 3. Signs shall be posted on each road frontage on the subject property and shall be clearly <br /> visible and accessible. <br /> 4. Signs shall be posted and on site prior to issuance of a Notice of Application. <br /> 5. The sign shall be a minimum two feet by three feet and laminated and posted in a sturdy <br /> manner to remain on site until after the expiration of the notice of decision appeal period. <br /> It shall be the responsibility of the applicant to properly dispose of the sign. <br /> 6. At the time of development application, Community Development Services will identify <br /> the number of signs needed and the general location of each sign on the subject property. <br /> 7. It shall be the responsibility of the applicant to place the structure in which the sign will be <br /> posted on site. At such time the structure and sign is in place,the applicant shall return the <br /> signed affidavit of posting form to Community Development Services. <br /> (Ord. 2007-22,2007; Ord. 2014-015,2014; Ord. 2025-003, 3/18/2025) <br /> § 15A.03.120. Project permit categories and review timelines. <br /> 1. Administrative permits. <br /> a. Administrative permits include those land use applications that do not require public <br /> notice or a public hearing. <br /> b. Decisions on administrative application shall be made within 30 days of the deemed <br /> Downloaded from https:Hecode360.com/KI6857 on 2026-04-22 <br />