Laserfiche WebLink
ELLAN E) <br />Cost Summary <br />contract Number Date Item Number Item Name <br />6/5/2026 RF7131 <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />RFI131 Yard Hydrant Relocation <br />Time Worked Record <br />Workers and/or Equipment ]-fours Worked <br />Occupation of Workers or Equipment Size Reg. Rate Amount <br />Working Reg, <br />Labor <br />1 Forennan 4.0 $102.61 $410.44 <br />2 <br />Operator <br />4.0 <br />$100.07 <br />$400.28 <br />3 <br />Operator <br />$100.07 <br />$0.00 <br />4 <br />Operator <br />$100.07 <br />$0.00 <br />5 <br />Operator <br />$100.07 <br />$0.00 <br />s <br />Operator <br />$100.07 <br />$0.00 <br />7 <br />Operator (Roller) <br />$94.82 <br />$0.00 <br />8 Pipe Layer $66.07 <br />$0.00 <br />9 Pipe Layer 4.0 $66.07 <br />$264.28 <br />10 General Laborer $62.45 <br />$0.00 <br />11 <br />$0.00 <br />Labor Subtotal <br />$1,075.00 <br />15% Markup <br />$161.25 <br />$1,236.25 <br />Labor Total <br />Equipment <br />12 238 Excavator <br />$137.12 $0.00 <br />13 138 Excavator <br />$124.46 $0.00 <br />14 Loader 1.0 <br />$84.33 $84.33 <br />15 1 Mini Excavator 4.0 <br />$56.10 $224.40 <br />Skid Steer <br />$80.18 $0.00 <br />Roller <br />$25.32 $0.00 <br />L1817 <br />Pickup <br />$43.80 $0.00 <br />1-Ton 4.0 <br />$47.22 $188.88 <br />Equipment Subtotal <br />$497.61 <br />$74.64 <br />h/ Markup <br />$572.25 <br />Equipment Total <br />Materials <br />20 ISaddle & Fittings I LS $300.00 <br />$300.00 <br />21 <br />Crushed Rock <br />2 <br />TN <br />$16.00 <br />$32.00 <br />22 <br />$0.00 <br />23 <br />$0.00 <br />24 <br />1 <br />$0.00 <br />25 <br />1 <br />$0.00 <br />2s <br />$0.00 <br />27 <br />$0.00 <br />28 <br />$0.00 <br />Materials Subtotal <br />$332.00 <br />15% Markup <br />$49.80 <br />Materials Total <br />$381.80 <br />Calculated By jDate Checked By Date <br />Total <br />$2,190.30 <br />