My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-29-minutes-ec-study-session
>
Meetings
>
2026
>
07. July
>
2026-07-07 10:00 AM - Commissioners' Agenda
>
2026-06-29-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 12:49:34 PM
Creation date
7/2/2026 12:46:52 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
146084
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELLAN E) <br />Cost Summary <br />contract Number Date Item Number Item Name <br />6/5/2026 RF7131 <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />RFI131 Yard Hydrant Relocation <br />Time Worked Record <br />Workers and/or Equipment ]-fours Worked <br />Occupation of Workers or Equipment Size Reg. Rate Amount <br />Working Reg, <br />Labor <br />1 Forennan 4.0 $102.61 $410.44 <br />2 <br />Operator <br />4.0 <br />$100.07 <br />$400.28 <br />3 <br />Operator <br />$100.07 <br />$0.00 <br />4 <br />Operator <br />$100.07 <br />$0.00 <br />5 <br />Operator <br />$100.07 <br />$0.00 <br />s <br />Operator <br />$100.07 <br />$0.00 <br />7 <br />Operator (Roller) <br />$94.82 <br />$0.00 <br />8 Pipe Layer $66.07 <br />$0.00 <br />9 Pipe Layer 4.0 $66.07 <br />$264.28 <br />10 General Laborer $62.45 <br />$0.00 <br />11 <br />$0.00 <br />Labor Subtotal <br />$1,075.00 <br />15% Markup <br />$161.25 <br />$1,236.25 <br />Labor Total <br />Equipment <br />12 238 Excavator <br />$137.12 $0.00 <br />13 138 Excavator <br />$124.46 $0.00 <br />14 Loader 1.0 <br />$84.33 $84.33 <br />15 1 Mini Excavator 4.0 <br />$56.10 $224.40 <br />Skid Steer <br />$80.18 $0.00 <br />Roller <br />$25.32 $0.00 <br />L1817 <br />Pickup <br />$43.80 $0.00 <br />1-Ton 4.0 <br />$47.22 $188.88 <br />Equipment Subtotal <br />$497.61 <br />$74.64 <br />h/ Markup <br />$572.25 <br />Equipment Total <br />Materials <br />20 ISaddle & Fittings I LS $300.00 <br />$300.00 <br />21 <br />Crushed Rock <br />2 <br />TN <br />$16.00 <br />$32.00 <br />22 <br />$0.00 <br />23 <br />$0.00 <br />24 <br />1 <br />$0.00 <br />25 <br />1 <br />$0.00 <br />2s <br />$0.00 <br />27 <br />$0.00 <br />28 <br />$0.00 <br />Materials Subtotal <br />$332.00 <br />15% Markup <br />$49.80 <br />Materials Total <br />$381.80 <br />Calculated By jDate Checked By Date <br />Total <br />$2,190.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.