My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-29-minutes-ec-study-session
>
Meetings
>
2026
>
07. July
>
2026-07-07 10:00 AM - Commissioners' Agenda
>
2026-06-29-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 12:49:34 PM
Creation date
7/2/2026 12:46:52 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
146084
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E ELLP.N t] <br />Daily Report of Force Account Worked <br />Contract Number <br />Date 11tem <br />512012026 <br />Number <br />Item Name <br />RFP 11 <br />Prime Contractor <br />Subcontractor/Lower Tier Subcontractor <br />Selland Construction, Inc. <br />Cascade Central Construction <br />Description of Work Performed <br />RFP 11 Re -Grading and Concrete Prep (991 SF added) <br />Time Worked Record <br />Workers and/or Equipment <br />Working <br />Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate <br />Amount <br />Reg• <br />Labor <br />1 Fore►rran 10.0 $102.61 $1,026.10 <br />2 <br />Operator <br />10.0 <br />$100.07 <br />$1, 000.70 <br />3 <br />Operator <br />$100.07 <br />$0.00 <br />4 <br />Operator <br />$100.07 <br />$0.00 <br />5 <br />Operator <br />$100.07 <br />$0.00 <br />6 <br />Operator <br />$100.07 <br />$0.00 <br />7 <br />Operator (Roller) <br />$94.82 <br />$0.00 <br />6 <br />Pipe Layer <br />$66.07 <br />$0.00 <br />g <br />Pipe Layer <br />$66.07 <br />$0.00 <br />10 <br />General Laborer <br />10.0 <br />$62.45 <br />$624.50 <br />11 <br />$0.00 <br />Labor Subtotal <br />$2, 651.30 <br />15% Markup <br />$397.70 <br />Labor Total <br />$3,049.00 <br />Equipment <br />12 <br />238 Excavator <br />$137.12 <br />$0.00 <br />13 <br />138 Excavator <br />$124.46 <br />$0.00 <br />14 <br />Loader <br />5.0 <br />$84.33 <br />$421.65 <br />15 <br />Mini Excavator <br />5.0 <br />$56.10 <br />$280.50 <br />16 <br />Skid Steer <br />5.0 <br />$80.18 <br />$400.90 <br />17 <br />Roller <br />$25.32 <br />$0.00 <br />16 <br />Pickup <br />$43.80 <br />$0.00 <br />19 <br />1-Ton <br />10.0 <br />$47.22 <br />$472.20 <br />Equipment Subtotal <br />$1,575.25 <br />15% .Vurkup <br />S236.29 <br />Equipment Total <br />$1,811.54 <br />Materials <br />20 <br />$0.00 <br />21 <br />Crushed Rock <br />35 <br />TN <br />$16.00 <br />$560.00 <br />22 <br />$0.00 <br />23 <br />$0.00 <br />24 <br />$0.00 <br />25 <br />$0.00 <br />26 <br />$0.00 <br />27 <br />$0.00 <br />26 <br />$0.00 <br />77 <br />Materials Subtotal <br />S560.00 <br />1.5% Markup <br />S8$.00 <br />Materials Total <br />$644.00 <br />Calculated By Date <br />Checked By Date <br />Total <br />$5,504.53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.