My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 09_Signed
>
Meetings
>
2026
>
06. June
>
2026-06-29 2:00 PM - EC Study Session
>
Change Order 09_Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2026 11:24:09 AM
Creation date
6/25/2026 10:35:16 AM
Metadata
Fields
Template:
Meeting
Date
6/29/2026
Meeting title
EC Study Session
Location
BOCC Conference Room
Address
205 West 5th Room 108 - Ellensburg
Meeting type
Special
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Breakdown <br /> Project Name: Ellensburg Rodeo Arena Improvments COP-17 <br /> Project No. Date: 5/22/2026 <br /> Contractor: McGann Electric Contractor Ref.No. <br /> Unit Labor Material Equipment Total <br /> Description Quantity Type Unit$ Cost Unit$ Cost Unit$ Cost Cost <br /> Electrician Labor 51 HR $106.95 $ 5,454.45 $ - $ - $ 5,454.45 <br /> Foreman Labor HR $117.14 $ - $ - $ - $ - <br /> $ $ $ $ <br /> bellbox and cover 1 EA $ - $19.50 $ 19.50 $ $ 19.50 <br /> 3/4 emt 40 FT $ - $1.36 $ 54.40 $ - $ 54.40 <br /> EMT fittings 1 LT $ - $35.00 $ 35.00 $ - $ 35.00 <br /> hardware 1 LT $ - $21.00 $ 21.00 $ $ 21.00 <br /> terminations 1 LT $ - $40.00 $ 40.00 $ $ 40.00 <br /> THHN 120 FT $ - $0.22 $ 26.40 $ $ 26.40 <br /> 18g 2c WL cable 40 FT $ - $0.36 $ 14.40 $ $ 14.40 <br /> Puck lighting, driver, hardware 1 LT $ $5,119.60 $ 5,119.60 $ $ 5,119.60 <br /> shipping and handling 1 LT $ $150.00 $ 150.00 $ $ 150.00 <br /> $ - $ - $ - $ - <br /> Labor Subtotal $ 5,454.45 <br /> $ $ $ $ <br /> $ $ $ $ <br /> Subtotal Cost of Work 2v1/2017 $ 5,454.45 $ 5,480.30 $ - $ 10,934.75 <br /> https://mcgannelectric-my.sharepoint.com/personal/jackmcgann_mcgannelectric_com/Documents/McGann EhsttEixdW2Fb&lensburg Rodeo 9.30/COPs/COP 17 additional puck lighting/Ellensburg Rodeo PIV Valve CORLEed 5/25/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.