Laserfiche WebLink
r <br /> S ELLAN 0 <br /> C O N S T R LJ C T 1 O N <br /> G` 1-1 Cost Summary <br /> Contract Number Date Item Number Item Name <br /> 6/5/2026 RFI 131 <br /> Prime Contractor Subcontractor/Lower Tier Subcontractor <br /> Cascade Central Construction Selland Construction,Inc. <br /> Description of Work Performed <br /> RFI 131 Yard Hydrant Relocation <br /> Time Worked Record <br /> Workers and/or Equipment Hours Worked <br /> Working Occupation of Workers or Equipment Size Reg Reg.Rate Amount <br /> Labor <br /> 1 Foreman 4.0 $102.61 $410.44 <br /> 2 Operator 4.0 $100.07 $400.28 <br /> 3 Operator $100.07 $0.00 <br /> 4 Operator $100.07 $0.00 <br /> 5 Operator $100.07 $0.00 <br /> 6 Operator $100.07 $0.00 <br /> 7 Operator(Roller) $94.82 $0.00 <br /> 8 Pipe Layer $66.07 $0.00 <br /> 9 Pipe Layer 4.0 $66.07 $264.28 <br /> 10 General Laborer $62.45 $0.00 <br /> 11 $0.00 <br /> Labor Subtotal $1,075.00 <br /> 15% Markup $161.25 <br /> Labor Total $1,236.25 <br /> Equipment <br /> 12 238 Excavator $137.12 $0.00 <br /> 13 138 Excavator $124.46 $0.00 <br /> 14 Loader 1.0 $84.33 $84.33 <br /> 15 Mini Excavator 4.0 $56.10 $224.40 <br /> 16 Skid Steer $80.18 1 $0.00 <br /> 17 Roller $25.32 $0.00 <br /> 18 Pickup $43.80 $0.00 <br /> 19 1-Ton 4.0 $47.22 $188.88 <br /> Equipment Subtotal $497.61 <br /> 15% Markup $74.64 <br /> Equipment Total $572.25 <br /> Materials <br /> 20 Saddle&Fittings I LS $300.00 $300.00 <br /> 21 Crushed Rock 2 TN $16.00 $32.00 <br /> 22 $0.00 <br /> 23 $0.00 <br /> 24 $0.00 <br /> 25 $0.00 <br /> 26 $0.00 <br /> 27 $0.00 <br /> 28 $0.00 <br /> Materials Subtotal $332.00 <br /> 15% Markup $49.80 <br /> Materials Total $381.80 <br /> Calculated By jDate Checked By IDate <br /> Total $2,190.30 <br />