My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 09_Signed
>
Meetings
>
2026
>
06. June
>
2026-06-29 2:00 PM - EC Study Session
>
Change Order 09_Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2026 11:24:09 AM
Creation date
6/25/2026 10:35:16 AM
Metadata
Fields
Template:
Meeting
Date
6/29/2026
Meeting title
EC Study Session
Location
BOCC Conference Room
Address
205 West 5th Room 108 - Ellensburg
Meeting type
Special
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wo bring ow clients'sloiies to life. <br /> a.���rii rEc <br /> SPOKANE <br /> 203 N Washington <br /> CHANGE ORDER NO. 9 Suite 400 <br /> Spokane, WA <br /> PROJECT NAME: Ellensburg Rodeo Arena Completion 99201 <br /> OWNER: Kittitas County a 509.838.8568 <br /> CONTRACTOR: Cascade Central Construction aiscarchitecrs.corn <br /> PROJECT NO: 2025-009 PAGE 1 of 13 <br /> DESCRIPTION OF CHANGE: Amount <br /> COP 38-RFP 12-RFI 122 Stair Aisle Illumnation $14,947.62 <br /> COP 39-RFP 11 -West Entry Flatwork Rev $8,797.79 <br /> COP 40-RFI 131 South End Hydrant Change $2,376.28 <br /> Total This Change Order: $26,121.69 <br /> Original Contract Sum $5,065,000.00 Accepted by Contractor: <br /> Net Amount of Previously Approved Changes: $1,509,967.08 Cascade Central Construction <br /> Contract Sum Prior to This Change Order: $6,574,967.08 By: <br /> Contract Sum is increased by This Change Order: $26,121.69 Date 6/15/26 <br /> Revised Contract Sum: $6,601,088.77 Recommended By: <br /> ALSC Architects, P.S. <br /> Original Contract Completion Date: 7/20/2026 <br /> By: <br /> Previously Approved Increases in Time: 7 <br /> Date (o 1 15`Z6 <br /> Completion Date Prior to This Change Order: 7/23/2026 <br /> Approved by Owner: <br /> Contract time will be changed by <br /> Calendar Days This Change Order 0 <br /> Revised Substantial Completion Date: 7/27/2026 By: <br /> Revised Final Acceptance Date: 8/22/2026 Date <br /> *Does not include State or Local Sales Tax ALSC Architects I We bring our clients' stories to life. <br />
The URL can be used to link to this page
Your browser does not support the video tag.