Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: 98-021 <br />Code flacavinlian <br />Cost Code Review <br />T&M: Trench BackfiIl Hardscape Ar <br />Class Reo- Ilnrrrs OT Hours <br />Job Code: 2550-30 <br />Other Hours <br />Production Quantities: 0.000 <br />2533 WLLIAM GREEN <br />RLD409 950 Loader <br />0.00 <br />1.00 <br />1.00 <br />0.00 <br />350 0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />{.0 <br />1.0 <br />Company Note: <br />lndexes: <br />lnspector Note: Export of unsuitable backfill materiel from the east building bathroom 109 feet of conduit trench <br />Production Quantities: 0.000 <br />2533 WLLIAM GREEN 210 <br />FB323 2024 RAM 3500 Flatbed <br />2541 PARKERBERMAN 310 <br />RBH44O JOHN DEER MINI EXCAVATO <br />8H354 2021Komalsu PC238 Exc <br />2541 PARKER BERMAN 210 <br />1.00 <br />1.00 <br />1.00 <br />0.50 <br />0.50 <br />0.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page 4 <br />2.5 <br />2.0 <br />Date: