Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between 101612025 and31412026 <br />Date Foreman Cost Code Note Index Codes <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot: 4 <br />Company Note: <br />lnspector Note: <br />01t12t2026 2566 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot; 2 <br />Company Note: <br />Inspector Note <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />9x9x.5ft <br />9x9x2ft <br />40fV7x1 <br />15x7fl.tt <br />All of this was the next few lifts on the continuous footing from north building to the west building. <br />Tony had 3 hours moving the rest of the materiel as well as bringing bedding from the stockpile over to the bedding box <br />Attached lmages/Documents <br />Excavated footing on the new location ofthe stage, <br />We had to over excavate the entire footing area The spread footings that were 7x6 had to be over excavated including the concrete formr <br />Making the base for the footing a 9.5 squared. And the continues footing that was 2.5 width was over built for forms at 4.5. <br />Footing builds <br />9.5x9.5x3ft <br />4.5x9x2ft <br />9.5x9.5x2ft <br />10x4.5x2ft <br />9ffi4.5x3ft <br />9.5x9.5x2.5ft <br />8ftx4.6x3ft <br />9.5x9.5x1.6 <br />All built of in 6 in lifts with base course <br />Time includes loader operator and removal of excess spoils. To stock pile. <br />indicates Selection Choice <br />with Asterisks Printed on: 03/04/2026 Page 7A Bolded Note Index