Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between L01612025 and 31412026 <br />Date Foreman Cost Code Note Index Codes <br />12t29t202s 2s66 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot: 2 <br />Company Note: <br />Inspector Note: <br />1A30t2025 2566 - DYLAN <br />12t30t2025 9091 - NIC LOPEZ <br />12t31t2025 2566 - DYLAN <br />01t05t2026 2566 - DYLAN <br />01t0612026 2566 - DYLAN <br />01t07t2026 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />154 ft of the over excavated area that needed to be built back up got the second lift installed at a .5 build we ended up stretching the overb <br />from the 2 ft wide footing that we had built up at 3 feet to 3.5 feet wide to allow a stable base on the sides for a footing to be placed on with< <br />edges being scuffed off. <br />Although there was discrepancies with how hippy staked the footings out we did meet the correct elevation from top of footing with our secr <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />indicates Se/ecfion Choice <br />Asferlsks Printed on: 03/04/2026 18:A Bolded Note Index 5