My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between L01612025 and 31412026 <br />Date Foreman Cost Code Note Index Codes <br />12t29t202s 2s66 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot: 2 <br />Company Note: <br />Inspector Note: <br />1A30t2025 2566 - DYLAN <br />12t30t2025 9091 - NIC LOPEZ <br />12t31t2025 2566 - DYLAN <br />01t05t2026 2566 - DYLAN <br />01t0612026 2566 - DYLAN <br />01t07t2026 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />154 ft of the over excavated area that needed to be built back up got the second lift installed at a .5 build we ended up stretching the overb <br />from the 2 ft wide footing that we had built up at 3 feet to 3.5 feet wide to allow a stable base on the sides for a footing to be placed on with< <br />edges being scuffed off. <br />Although there was discrepancies with how hippy staked the footings out we did meet the correct elevation from top of footing with our secr <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />indicates Se/ecfion Choice <br />Asferlsks Printed on: 03/04/2026 18:A Bolded Note Index 5
The URL can be used to link to this page
Your browser does not support the video tag.