My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between 101612025 znd 3/412026 <br />Date Foreman Cost Code Note Index Codes <br />12t1612025 2566 - DYLAN <br />12t16t2025 9091 - NIC LOPEZ <br />12t17t2025 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot: 3 <br />Gompany Note: <br />Inspector Note: <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot 3 <br />Gompany Note: <br />lnspector Note: We had to over excavate a 12ftx4'6xZft <br />45ftx4'6x8in. <br />45 fkTftxS in. <br />And build back up to grade with base course in lifts to ensure compaction density with a non yielding prodding. <br />All over excavated builds are built with a 1 foot over build around the perimeter for a solid base for the footing to be set on <br />Attached lmages/Documents <br />20 ft x 4.6 ft x 2.8ft build of base course build. We were instructed to take the mucky non yielding clay materiel down to a solid base which <br />case on the upper footing on the stadium arena seating in the southe@st corner had a hefty over excavation to it. Wth 6 in lifts were installt <br />the same area there was a tapered off of the previously noted build where the over excavation was not as deep with a 20 ft x 4.6ft x 1ft built <br />the case with the builds being so deep the 'l ft perimeter over build was slightly bigger to a 1.Sft on the east side of the footing to account fo <br />sluffing off to create a solid base. <br />Attached lmages/Documents <br />indicates Selection Choice <br />Pinted on:18:50:26 Page 2ANote lndex Code with Asfersks
The URL can be used to link to this page
Your browser does not support the video tag.