Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: 98-005 <br />Code T)osc#nfinn <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F <br />Class Res. Hours OT Hours <br />Job Code: 2550-30 <br />TN <br />Other Hours <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 <br />2582 RANDYRAMOS 210 <br />1136 JASONTORRESVARGAS 310 <br />8H335 2015 Komatsu PC138 Exc(Yak) <br />3.00 <br />3.00 <br />3.00 <br />3.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals <br />Equip Totals <br />Hours - <br />Hours - <br />9.0 <br />3.0 <br />Gompany Note: <br />lndexes: <br />lnspector Note: 42'x!2' <br />26.44 tns 15.56 cY <br />Load bearing surface 1569.27 <br />Bottom of footing elevation 1571.250 <br />Ftg is south side of the complex in the chutes area ftg wall <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page 4 <br />Date:x