Laserfiche WebLink
Selland Construction Prevailing <br />Job Namo: Ellensburg Rodeo Arena lmprovements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-005 <br />Descrintion <br />Cost Code Review <br />T&M: Overexc. & Rock Placement f,' <br />Class Reg. Hours OT Hours <br />TN <br />Other Hours <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 2.00 0.00 0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />2.0 <br />0.0 <br />Production Quantities: 0.000 <br />2559 TUCKERSLABACH <br />1D363 2012CAT 930H Loader <br />350 6.00 <br />6.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />6.0 <br />6.0 <br />Production Quantities: 0.000 <br />2499 LEVI SHINNERS <br />LD376 Komatsu WA380 Loader <br />810 9.50 <br />9.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />9.5 <br />9.5 <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page 2 <br />16:06:57 <br />Date: