My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F TN <br />Class Res. Hours OT Hours <br />6x10x4 1572.7515.11tn 8.89 cu yds <br />Job Code: 2550-30 <br />Code <br />98-005 <br />T)esnrinfinn Other Hours <br />Production Quantities <br />2566 <br />2582 <br />2582 <br />R1329 <br />2533 <br />BH354 <br />2541 <br />RBH44O <br />2453 <br />D2362 <br />0.000 <br />DYLAN BROWN 810 <br />RANDYRAMOS 210 <br />RANDY RAMOS 370 <br />2008 CAT GS56 Roller <br />WILLIAM GREEN 310 <br />2021Komatsu PC238 Exc <br />PARKERBERMAN 310 <br />JOHN DEER MINI EXCAVATO <br />JACOB NEMEC 320 <br />2019 CAT D6K Dozer <br />0.00 <br />0.00 <br />0.00 <br />1.00 <br />0.00 <br />1.00 <br />2.OO <br />2.00 <br />0.00 <br />2.00 <br />0.00 <br />0.00 <br />0.00 <br />2.OO <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />1.00 <br />1.00 <br />1.00 <br />0.00 <br />1.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />8.0 <br />6.0 <br />Matl-Sub-Exp <br />2MFILL <br />Description <br />Fill Mateial Purchase & Deliv <br />Cost Type <br />M <br />Units Received <br />128-000 <br />Used <br />128.000IN <br />Gompany Note: <br />lndexes: <br />lnspector Note: 75x32 feet that was over excavated beginning elevation was 1576.80 this area as mucked out at 1575.95 to get rid of that muddy soft <br />surface to a non yielding surface <br />75.56 cy <br />Attendance/Non-Use Codes included in Hours: None / None <br />on:11 :O0:5 <br />Date: <br />B/05n026 <br />Page 7
The URL can be used to link to this page
Your browser does not support the video tag.