Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-005 <br />Descrintion <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F <br />Class Res. Hours OT Hours <br />TN <br />Other Hours <br />Production Quantities: 0.000 <br />2566 DYIAN BROWN <br />RBH400 CAT 313 GC Excavator <br />2582 RANDYRAMOS <br />2533 WLLIAM GREEN <br />RLD409 950 Loader <br />6.00 <br />8.00 <br />8.00 <br />8.00 <br />8.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />810 <br />210 <br />350 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />22,0 <br />{6.0 <br />Matl-Sub-Exp <br />2MCSBC <br />Description <br />Base Cr <br />CostType <br />M <br />Units Received <br />113.000 <br />Used <br />113.000TN <br />Company Note: <br />lndexes: <br />lnspector Note: . The geo engineer determined The soft spots needed to be removed to build on top of <br />We nid one lt 65'x12' from 1574.21 back to the exhisting grade of 1576..5 this was behind the east bathrooms on the concourse deck <br />closest to the stadium wall 113tn 66.44cu yds <br />We then over excavated. A second and third muck spot in a location going out the west stairs with a cut of materiel split up into two <br />separate cut depths. <br />38x20 starting bearing surface elevation starting at 1574.568 <br />This area was at the top of the stairwell covering a surface area <br />51'x16 down to1572.566 this was at the bas of the stairwell heading out towards the west alongside the south side of the west <br />bathroom <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page 3 <br />Date: