Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: 98-005 <br />Code Description <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F <br />Class Reg. Ilours OT Hours <br />Job Code: 2550-30 <br />TN <br />Other Hours <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN <br />BH356 2021 Kubota Exc <br />810 2.00 <br />2.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hourc - <br />Hours - <br />2.O <br />2.0 <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN <br />2582 RANDYRAMOS <br />2453 JACOB NEMEC <br />D2362 2019 CAT D6KDozer <br />810 <br />210 <br />320 <br />0.00 <br />0.00 <br />0.00 <br />4.00 <br />2.00 <br />4.00 <br />4.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />{0.0 <br />4.0 <br />Company Note: <br />lnspector Note: <br />lndexes: <br />Bladed of the concourse at a 1577.0 elevation so when we build up the area that below footings are all even with a two foot build of <br />structural compacted fill below footSngs. <br />This Weill save over excavating time when comes time to dig out footings on the concourse grade. <br />Attendance/Non-Use Codes included in Hours: None / None <br />Pinted on: <br />Page 1 <br />Date: