My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F' <br />Class Res. Hours OT Hours <br />Job Code: 2550-30 <br />98-005 <br />T)escrinfion <br />TN <br />Code Other Ilours <br />Production Quantities: 0.000 <br />1192 JOSHUASAMPSON <br />2566 DYI.AN BROWN <br />BH354 2021Komatsu PC238 Exc <br />210 <br />810 <br />5.50 <br />5.00 <br />2.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />. Equip Totals: <br />Hours - <br />Hours - <br />10.5 <br />2.5 <br />Matl-Sub-Exp <br />2MCSBC <br />Description <br />Base Cr <br />CostType <br />M <br />Units Received <br />24.990 <br />Used <br />24.990TN <br />Gompany Note: <br />lndexes: <br />Inspector Note: 154 ft of the over excavated area that needed to be built back up got the second lift installed at a .5 build we ended up stretching the <br />overbuild from the 2 ft wide footing that we had built up at 3 feet to 3.5 feet wide to allow a stable base on the sides for a footing to be <br />placed on without the edges being scuffed off. <br />Although there was discrepancieJwith how hippy staked the footings out we did meet the correct elevation from top of footing with our <br />second lift. <br />Total Production Quantity: 10.000 TN <br />Aftendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page I <br />Date:
The URL can be used to link to this page
Your browser does not support the video tag.