Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F' <br />Class Res. Hours OT Hours <br />Job Code: 2550-30 <br />98-005 <br />T)escrinfion <br />TN <br />Code Other Ilours <br />Production Quantities: 0.000 <br />1192 JOSHUASAMPSON <br />2566 DYI.AN BROWN <br />BH354 2021Komatsu PC238 Exc <br />210 <br />810 <br />5.50 <br />5.00 <br />2.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />. Equip Totals: <br />Hours - <br />Hours - <br />10.5 <br />2.5 <br />Matl-Sub-Exp <br />2MCSBC <br />Description <br />Base Cr <br />CostType <br />M <br />Units Received <br />24.990 <br />Used <br />24.990TN <br />Gompany Note: <br />lndexes: <br />Inspector Note: 154 ft of the over excavated area that needed to be built back up got the second lift installed at a .5 build we ended up stretching the <br />overbuild from the 2 ft wide footing that we had built up at 3 feet to 3.5 feet wide to allow a stable base on the sides for a footing to be <br />placed on without the edges being scuffed off. <br />Although there was discrepancieJwith how hippy staked the footings out we did meet the correct elevation from top of footing with our <br />second lift. <br />Total Production Quantity: 10.000 TN <br />Aftendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page I <br />Date: