Laserfiche WebLink
X,s cent */e c fraruicaf an[ cpturtff*g Inc <br />TO:KC Garroll <br />Cascade Central Construction <br />COST CHANGE PROPOSAL <br />Phone: 509-662-71 10 <br />nls <br />Date: 27-Apr-26 <br />1 285 SD. Wenatchee Ave.Request No: <br />Fax No: <br />Our Job No.: <br />Our CCP No: <br />Wenatchee, WA 99807-01 19 <br />Project:Ellensburq Rodeo Arena I 352 <br />003 <br />tl <br />Scope of Work: <br />T&M <br />Chase Water Reroute <br />Cost Plus Fixed PriceX <br />LaborHours 5.91 hours @ _g 15091- perhour = E <br />Sick Leave Mhours @ $ - <br />Labor Burden <br />lnsurance Jhours @ $ - Perhour= E <br />Travel Time 0.00 Hr x Rate $ - per hour = <br />Total Labor Cost: <br />Materials & Supplies $ <br />Anticipated Escalation 0o/o <br />Small Tools <br />Welder hours @ $ 40.00 Per hour = E <br />Tool & Equipment Rentals <br />Total Material & Equipment Cost: <br />Estimation, Manager Review & Administrative Costs ( $108.91 / hr) <br />Supervision Labor Costs (15% of labor) ( ) OYo <br />WTSHA OYo <br />Small Tools 0o/o <br />Warranty 0o/o <br />Consumables 0o/o <br />Shop Drawings <br />Subcontractors: <br />Total Miscellaneous Gost: <br />Total Estimated Direct Cost: <br />Profit <br />Overhead <br />Total Cost: <br />lnsulation <br />0.00 <br />0.00 <br />0.00 <br />Sub-Total S ubcontractor Cost: <br />Ascent Mechanical Overhead & Profit @ <br />Total Subcontractor Cost: <br />Sub-Total: <br />lnsurance: <br />Bond: <br />CAT Tax @ <br />TOTAL Amount: <br />Submitted by: <br />Date: <br />890.11 <br />222.53 <br />$1 112.63 <br />$ 2,098.23 <br />$ <br />$ 3,210.86 <br />12o/o 385.30 <br />12%385.30 <br />$ 3,981.47 <br />s81.47 <br />0.37o/o <br />0.00% <br />0.00% <br />14.73 <br />$3.996 <br />Scott Turk <br />April2T,2026 <br />5o/ochange required time extension of <br />Pricing void/subject to revision after 5 Days <br />costs presented in this change include only those costs <br />be identified at this time. No impaci or delay costs <br />Should ii be determined that the project is impacted at <br />date by multiple changes, delays or other causes, we <br />those costs at lhat time. Work will commence upon <br />by authorized representative only. <br />assume work will start on <br />by <br />and be <br />P.O. Box 38 Rathdrum, ld 83858 PH: 208-4746-6331 F: 208-687-9198