My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alts*, <br />EL.101 - SITE PLAN. LICHTING <br />o Deteted: (4) Type EX tight fixtures atong the fence [ine. <br />o Deleted: (6)Type X2 tight fixtures atong the fence [ine' <br />o Deteted: Circuiting border and associated annotation, "CIRCUITTO PANEL L3A, CIRCUIT 17" <br />ALSC Architects. P.S. BY Todd Keller Date: 3111126 <br />PROPOSAL: <br />To the Owner: We propose to perform all changes described in the above request for a totalrttEEfflOltt/DEDUCTION <br />(cross out one) to the contract sum of: <br />FORry THOU SAND SIX HUNDRED SIXTY-FOUR AND OO/1OO DOLLARS q 40,664.53 <br />(not including Sales Tax) <br />We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to <br />this proposal and to the <br />remain in fullforce and <br />calendar days because <br />after this date <br />oate 4125126 <br />Contractor <br />RECOMMENDATION: <br />TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend <br />its acceptance. <br />ALSC ifacfs P -s_Date <br />PROPOSAL ACGEPTANCE: <br />The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions <br />upon which a Change Order will be issued. <br />By Date- <br />Owner <br />effect of the proposal on the remainder of the project. All other provisions of the contract <br />effect. We request the completion date be EXFENDEUREDUCED (cross one out) 0 <br />of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days <br />ALSG Architects \\ We bring our clients'storie$ to life.
The URL can be used to link to this page
Your browser does not support the video tag.