My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.08.2026 PW SS Briefing
>
Meetings
>
2026
>
06. June
>
2026-06-08 1:30 PM - Public Works Study Session
>
06.08.2026 PW SS Briefing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2026 11:38:39 AM
Creation date
6/5/2026 8:53:57 AM
Metadata
Fields
Template:
Meeting
Date
6/8/2026
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION: <br /> Lightcurve has been working on the design and build of the broadband network funded <br /> through a Public Works Board grant. In the Thorp project area, Lightcurve has spent <br /> more than a year attempting to obtain clear and reasonable justification regarding permit <br /> costs through the BNSF. The work to be permitted involves placing additional fiber <br /> strands into an existing conduit within the BNSF right-of-way. BNSF representatives <br /> have failed to attend scheduled meetings or provide information requested. These delays <br /> are impacting rural residents and the ability to obtain broadband service. <br /> A letter has been prepared and attached, requesting Senate and Department of Commerce <br /> support in working with BNSF for the necessary permits, which will allow the broadband <br /> project to proceed and reduce future delays. <br /> FISCAL IMPACT: <br /> Potential impact to grant funding if permits are not issued <br /> ATTACHMENTS: <br /> Draft Letters regarding permit support working with BNSF <br />
The URL can be used to link to this page
Your browser does not support the video tag.