My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 12/1/2025 and 3/16/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/16/2026 13:49:46 Page 8 <br />indicates Selection Choice <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot:3 <br />Company Note: <br />Inspector Note:Trench backfill in a hardscape area starting elevation of trench is 1573.5 built back up with 57 ft long 3.5 ft wide x4 ft 43.96 ton 25.86 <br />cy <br /> East Ada ramp where the water runs under the side walk down grid line 1and k to grid line 1 and h <br />Grid line f and north of grid line 1 to west of grid line d and north of grid line 1 the slab on the northside of the bar building 35ftx3.5x3.5 <br />27tn 15.88cy <br />Total cubic yards is 41.74 <br />Total tns is70.96 <br />03/02/2026 2566 - DYLAN <br />Attached Images/Documents <br />03/09/2026 2566 - DYLAN <br />Attached Images/Documents <br />03/16/2026 2566 - DYLAN <br />Attached Images/Documents <br />NOTE: <br />Filters in effect: <br />Dates >= 12/01/2025 and Dates <= 03/16/2026. <br />All Foremen. <br />Print : Working Conditions. <br />Print : Daily Diary Notes. <br />Print : Cost Code Notes. <br />All Note Indexes. <br />Cost Code = 98-021.
The URL can be used to link to this page
Your browser does not support the video tag.