Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 12/1/2025 and 3/16/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/16/2026 13:49:44 Page 3 <br />indicates Selection Choice <br />Attached Images/Documents <br />01/12/2026 2566 - DYLAN <br />Attached Images/Documents <br />01/13/2026 2566 - DYLAN <br />Attached Images/Documents <br />01/14/2026 2566 - DYLAN <br />Attached Images/Documents <br />01/15/2026 2566 - DYLAN <br />Attached Images/Documents <br />01/19/2026 2566 - DYLAN <br />Attached Images/Documents <br />01/20/2026 2566 - DYLAN <br />Attached Images/Documents <br />01/22/2026 2566 - DYLAN <br />Bear testing was on site testing concrete on this day so we went ahead and had them proof roll the north buildings first lift. I do <br />believe it is gonn be easing placing conduit on the 1.5 ft minus from finish and backfill the remainder of the build8ng after the <br />plumbing and elenctrical is installed <br />01/26/2026 2566 - DYLAN <br />Attached Images/Documents