Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-021 T&M: Trench Backfill Hardscape Ar <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/16/2026 13:44:26 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 1 <br />Date: 01/29/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 81.000 <br />2566 DYLAN BROWN 310 2.00 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 1.00 0.00 0.00 <br />2582 RANDY RAMOS 210 2.00 0.00 0.00 <br />2533 WILLIAM GREEN 350 1.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 1.00 0.00 0.00 <br />Labor Totals: Hours - 5.0 <br />Equip Totals: Hours - 2.0 <br />Cost Code Notes: <br />Slot:5 <br />Company Note: <br />Indexes: <br />Inspector Note:Brought in materiel and placed structural fill in hard scape areas northside of the north build from the east side of the clean out <br />closest to the concessions building to the east <br /> And the sewer run that runs parallel to the north side of the east building