Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 04/17/2026 16:06:58 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 4 <br />Date: 03/17/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 3.00 0.00 0.00 <br />2582 RANDY RAMOS 210 3.00 0.00 0.00 <br />1136 JASON TORRES VARGAS 310 3.00 0.00 0.00 <br />BH335 2015 Komatsu PC138 Exc(Yak) 3.00 0.00 0.00 <br />Labor Totals: Hours - 9.0 <br />Equip Totals: Hours - 3.0 <br />Cost Code Notes: <br />Slot:3 <br />Company Note: <br />Indexes: <br />Inspector Note:42'x5'x2' <br />26.44 tns 15.56 cy <br />Load bearing surface 1569.27 <br />Bottom of footing elevation 1571.250 <br />Ftg is south side of the complex in the chutes area ftg wall