Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 04/17/2026 16:06:57 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 2 <br />Date: 03/04/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 2.00 0.00 0.00 <br />Labor Totals: Hours - 2.0 <br />Equip Totals: Hours - 0.0 <br />Date: 03/09/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2559 TUCKER SLABACH 350 6.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 6.00 0.00 0.00 <br />Labor Totals: Hours - 6.0 <br />Equip Totals: Hours - 6.0 <br />Date: 03/10/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2499 LEVI SHINNERS 810 9.50 0.00 0.00 <br />LD376 Komatsu WA380 Loader 9.50 0.00 0.00 <br />Labor Totals: Hours - 9.5 <br />Equip Totals: Hours - 9.5