Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 11:00:51 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 9 <br />Totals by individual items: <br />Employees: <br />1867 RAMIRO RAMIREZ MUNOZ 350 / 210 0.00 9.00 0.00 <br />2453 JACOB NEMEC 320 / 310 0.00 16.00 0.00 <br />2533 WILLIAM GREEN 350 / 210 / 31 25.50 1.00 0.00 <br />2541 PARKER BERMAN 350 / 310 3.00 0.00 0.00 <br />2566 DYLAN BROWN 810 34.00 13.00 0.00 <br />2582 RANDY RAMOS 210 / 370 33.50 16.00 0.00 <br />Totals:96.00 55.00 0.00 <br />Equipment: <br />BH354 2021 Komatsu PC238 Exc 11.00 0.00 0.00 <br />BH356 2021 Kubota Exc 2.00 0.00 0.00 <br />DZ362 2019 CAT D6K Dozer 6.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 8.50 0.00 0.00 <br />RBH400 CAT 313 GC Excavator 33.00 0.00 0.00 <br />RBH440 JOHN DEER MINI EXCAVA 2.00 0.00 0.00 <br />RL329 2008 CAT CS56 Roller 7.00 0.00 0.00 <br />RLD409 950 Loader 33.00 0.00 0.00 <br />Totals: 102.50 0.00 0.00 <br />Materials:Cost Type Units Received Used <br />2MCSBC Base Cr M TN 113.000 113.000 <br />2MFILL Fill Material Purchase & Deliv M TN 1,113.320 1,092.510