Laserfiche WebLink
Date Item Number <br />12/1/2025 <br />Reg. O.T. <br />1 24.0 $102.61 $2,462.64 <br />2 9.0 $100.07 $900.63 <br />3 $100.07 $0.00 <br />4 8.0 $100.07 $800.56 <br />5 $100.07 $0.00 <br />6 $100.07 $0.00 <br />7 $94.82 $0.00 <br />8 23.5 $66.07 $1,552.65 <br />9 1.0 $66.07 $66.07 <br />10 $62.45 $0.00 <br />11 $0.00 <br />15% Markup <br />12 13.5 $137.12 $1,851.12 <br />13 $124.46 $0.00 <br />14 5.5 $84.33 $463.82 <br />15 14.0 $56.10 $785.40 <br />16 $80.18 $0.00 <br />17 $25.32 $0.00 <br />18 24.0 $43.80 $1,051.20 <br />19 8.0 $47.22 $377.76 <br />15% Markup <br />20 282.97 TN $16.00 $4,527.52 <br />21 $0.00 <br />22 $0.00 <br />23 $0.00 <br />24 $0.00 <br />25 $0.00 <br />26 $0.00 <br />27 $0.00 <br />28 $0.00 <br />15% Markup <br />Date Checked By Date <br />Daily Report of Force Account Worked <br />Contract Number Item Name <br />Footing Subexcavation & Structural Fill <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Cascade Central Construction Selland Construction, Inc. <br />Description of Work Performed <br />Footing Excavation & Structural Fill (December 2025) <br />Time Worked Record <br />Workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate O.T. Rate Amount <br />Labor <br />Dylan Brown Foreman <br />Parker Berman Operator <br />Operator <br />Tony Sisco Operator <br />Operator <br />Operator <br />Operator (Roller) <br />Josh Sampson Pipe Layer <br />Randy Ramos Pipe Layer <br />General Laborer <br />Labor Subtotal $5,782.55 <br />$867.38 <br />Labor Total $6,649.93 <br />Equipment <br />238 Excavator <br />138 Excavator <br />Loader <br />Mini Excavator <br />Skid Steer <br />Roller <br />Pickup <br />1-Ton <br />Equipment Subtotal $4,529.30 <br />$679.39 <br />Equipment Total $5,208.69 <br />Materials <br />Base Cr. <br />Materials Subtotal $4,527.52 <br />$679.13 <br />Materials Total $5,206.65 <br />Calculated By <br />Total $17,065.26