Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 11:00:51 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 7 <br />6x10x4 1572.75 15.11tn 8.89 cu yds <br />Date: 02/13/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 0.00 1.00 0.00 <br />2582 RANDY RAMOS 210 0.00 1.00 0.00 <br />2582 RANDY RAMOS 370 0.00 1.00 0.00 <br />RL329 2008 CAT CS56 Roller 1.00 0.00 0.00 <br />2533 WILLIAM GREEN 310 0.00 1.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 1.00 0.00 0.00 <br />2541 PARKER BERMAN 310 2.00 0.00 0.00 <br />RBH440 JOHN DEER MINI EXCAVATO 2.00 0.00 0.00 <br />2453 JACOB NEMEC 320 0.00 2.00 0.00 <br />DZ362 2019 CAT D6K Dozer 2.00 0.00 0.00 <br />Labor Totals: Hours - 8.0 <br />Equip Totals: Hours - 6.0 <br />Matl-Sub-Exp: <br />Matl-Sub-Exp Description Cost Type Units Received Used <br />2MFILL Fill Material Purchase & Deliv M TN 128.000 128.000 <br />Cost Code Notes: <br />Slot:2 <br />Company Note: <br />Indexes: <br />Inspector Note:75x32 feet that was over excavated beginning elevation was 1576.80 this area as mucked out at 1575.95 to get rid of that muddy soft <br />surface to a non yielding surface <br />75.56 cy