Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 11:00:50 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 1 <br />Date: 02/02/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 2.00 0.00 0.00 <br />BH356 2021 Kubota Exc 2.00 0.00 0.00 <br />Labor Totals: Hours - 2.0 <br />Equip Totals: Hours - 2.0 <br />Date: 02/06/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 0.00 2.00 0.00 <br />2582 RANDY RAMOS 210 0.00 4.00 0.00 <br />2453 JACOB NEMEC 320 0.00 4.00 0.00 <br />DZ362 2019 CAT D6K Dozer 4.00 0.00 0.00 <br />Labor Totals: Hours - 10.0 <br />Equip Totals: Hours - 4.0 <br />Cost Code Notes: <br />Slot:6 <br />Company Note: <br />Indexes: <br />Inspector Note:Bladed of the concourse at a 1577.0 elevation so when we build up the area that below footings are all even with a two foot build of <br />structural compacted fill below foot8ngs. <br />This Weill save over excavating time when comes time to dig out footings on the concourse grade.