Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 10:59:29 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 6 <br />Date: 01/15/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO 350 5.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 5.00 0.00 0.00 <br />FB317 2023 DODGE RAM 3500 5.00 0.00 0.00 <br />2566 DYLAN BROWN 810 3.50 0.00 0.00 <br />1136 JASON TORRES VARGAS 310 3.25 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 3.25 0.00 0.00 <br />1136 JASON TORRES VARGAS 210 4.00 0.00 0.00 <br />Labor Totals: Hours - 15.7 <br />Equip Totals: Hours - 13.2 <br />Matl-Sub-Exp: <br />Matl-Sub-Exp Description Cost Type Units Received Used <br />2MCSBC Base Cr M TN 111.320 0.000 <br />Cost Code Notes: <br />Slot:1 <br />Company Note: <br />Indexes: <br />Inspector Note:We finished 36 ft build up with base course at 4.5 ft wide with a 1.2 build on the northside of the west building all the way to the nw <br />corner <br />We then started over at the stadium pad footing with plinths on the northside side of the west staircase that pad was a 8x8 so we dug <br />out at a 9x9 we hit the load bearing surface at 1569.655. And had to get a 3.345 build of base course on the 9x9 stadium pad we <br />also had the same build on the continues footing that went from that spread footing Down to the center of the west building <br />At 7 ft wide x. X4.095