My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 10:59:29 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 3 <br />Indexes: <br />Inspector Note:9x9x.5ft <br />9x9x2ft <br />40ftx7x1 <br />15x7x2 ft <br />All of this was the next few lifts on the continuous footing from north building to the west building. <br />Tony had 3 hours moving the rest of the materiel as well as bringing bedding from the stockpile over to the bedding box <br />Date: 01/12/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO 350 4.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 4.00 0.00 0.00 <br />FB317 2023 DODGE RAM 3500 4.00 0.00 0.00 <br />2566 DYLAN BROWN 810 2.00 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 2.00 0.00 0.00 <br />2566 DYLAN BROWN 810 3.50 0.00 0.00 <br />2347 ANTONIO SISCO 210 2.00 0.00 0.00 <br />Labor Totals: Hours - 11.5 <br />Equip Totals: Hours - 10.0 <br />Cost Code Notes: <br />Slot:2 <br />Company Note: <br />Indexes: <br />Inspector Note:Excavated footing on the new location of the stage, <br /> We had to over excavate the entire footing area The spread footings that were 7x6 had to be over excavated including the concrete <br />forms Making the base for the footing a 9.5 squared. And the continues footing that was 2.5 width was over built for forms at 4.5. <br /> Footing builds
The URL can be used to link to this page
Your browser does not support the video tag.