Laserfiche WebLink
<br />ALSC Architects \\ We bring our clients’ stories to life. <br /> <br />EL-101 – SITE PLAN – LIGHTING <br />• Deleted: (4) Type EX light fixtures along the fence line. <br />• Deleted: (6) Type X2 light fixtures along the fence line. <br />• Deleted: Circuiting border and associated annotation, “CIRCUIT TO PANEL L3A, CIRCUIT 17”. <br /> <br /> <br /> <br /> ALSC Architects, P.S. By Todd Keller Date: 3/11/26 <br /> <br />PROPOSAL: <br />To the Owner: We propose to perform all changes described in the above request for a total ADDITION/DEDUCTION <br />(cross out one) to the contract sum of: <br /> $ <br />(not including Sales Tax) <br />We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to <br />this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract <br />remain in full force and effect. We request the completion date be EXTENDED/REDUCED (cross one out) ________ <br />calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days <br />after this date. <br /> By Date <br />Contractor <br /> <br />RECOMMENDATION: <br />TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend <br />its acceptance. <br /> <br /> ALSC Architects, P.S. By Date: <br /> <br />PROPOSAL ACCEPTANCE: <br />The Owner hereby accepts the foregoing proposal. This instrument, when signed below, constitutes the conditions <br />upon which a Change Order will be issued. <br /> <br /> By Date <br />Owner <br />(40,664.53)FORTY THOUSAND SIX HUNDRED SIXTY-FOUR AND 00/100 DOLLARS <br />0 <br />Cascade Central Construction KC Carroll 4/25/26